Installation; Motor Preparation - SOMFY HOME MOTION Tilt & Lift 25 RTS Central Manual

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 39

2.1. INSTaLLaTIoN

2.1.1. Motor preparation

1) Cut the shaft to the length required.
2) Position the headrail and shaft
adapters on the motor.
2.1.2. Motor integration inside the headrail
1) Insert the motor in the headrail.
Take care not to cut the power
supply wires on the edges of the
headrail when introducing the
motor.
2) Let the shaft abut against the motor
shaft adapters.
For optimal radio reception, the
antenna should be kept straight
and outside the headrail.
2.1.3. Motor and shaft locking
Using the relevant tool, pinch headrail
edges to block motor translation.
To lock the shaft, place stop rings
against the CTS , and screw them.
Copyright © 2013 Somfy SAS. All rights reserved - V1 - 02/2013
1
2
1
2
5

Publicidad

Tabla de contenido
loading

Tabla de contenido