Operations; Operating; Loading - Testboy Light 500 Instrucciones De Empleo

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 33

Operations

Operations
Thank you for choosing the Testboy

Operating

|
The Light 500 can be switched on or off using
the switch on the top side. The operational
time is approximately 4.5 hours. When swit-
ched on, the red LED will signal that the bat-
tery charge is low.

Loading

|
Connect the AC adapter (included in delivery)
or car charger to the charging jack and to the
mains power source (or to the car's cigarette
lighter). When switched off, the red LED indi-
cates that the external power supply is con-
nected.
|
The Light 500 will be ready for operations af-
ter about two hours. To charge the battery
completely, leave the Light 500 charging for
one to two hours.
|
Then disconnect the power supply unit from
the external voltage source (or from the ciga-
rette lighter) and from the Light 500.
20
®
Light 500.
Switch
On / Off
Charging jack
®
Testboy
Light 500

Publicidad

Tabla de contenido
loading

Tabla de contenido