Descargar Imprimir esta página

Glass 1989 BEYOND BATH Manual De Instalación & Mantenimiento página 11

Publicidad

All measurements are in mm.
PRE-INSTALLATION REQUIREMENTS
IMPORTANT: Given the high capacity and weight of the
and building services engineering study is necessary.
EQUIPOTENTIAL CONNECTION.
The
following
accessories
ROUTINE AND
SPECIAL MAINTENANCE
After cleaning, rinse thoroughly with plenty of water to
remove all traces of detergent and dry with a soft cloth.
A
:
VOID
(not
supplied
by
the
IMPORTANT:
Rinse thoroughly with plenty of water to remove all traces
of detergent.
SURFACES IN PIETRALUCE
non-abrasive
After cleaning rinse thoroughly with clean water to remove
A
any cleaner residue.
VOID
personnel.
TROUBLESHOOTING
All
hydraulic
connection
performed by a hydraulic installation technician.
®
:
checkup
must
EN
be

Publicidad

loading