DOREL Living DA7499E Manual Del Usuario página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TWIN/FULL BUNK BED
DA7499E / DA7499W / DA7499G
STEP 8
Attach the other guardrail leg (Q) to long guardrails (L) and top side rail (I) with flat
head wood screws (6).
Secure the guardrail leg (Q) (done in step 6) to the top side rail (H) with flat head
wood screw (6) as shown.
Place four wood dowels (5) into the holes in the bottom headboard top crosses (T).
With the help of another person, stack the top bunk onto the bottom bunk.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Da7499wDa7499g0-65857-17298-00-65857-17299-7

Tabla de contenido