Installation Procedures

2. Location Relationship among Ceiling Hole, Unit and Hoisting Studs
AB052~162MCERA, AB182MCERA(C)
gap between studs 535mm
indoor unit 570mm
ceiling 650mm
decorated board 700mm
AB182~482MCERA
gap between studs 790mm
indoor unit 840mm
ceiling 890mm
decorated board 950mm
Note: Before suspending the indoor unit, select the installation location according to the piping
and wiring in the ceiling, and determine the lead direction of the piping. Prepare all pipes (refrigerator
and drainage) and wiring (connection line for remote control and connection line of indoor units
and outdoor units) connected to indoor units before suspending the indoor unit so as to make
the connections right after the installation.
In the situation with the ceiling, before suspending the unit, set refrigerant pipe, drainpipe,
connection line in the room, lead wire of line control to the locations of piping and wiring.
Confirm the size of the indoor unit and fix it according to the requirements in the manual.
The ceiling and decorated board overlapping
part should be more than 25mm
ceiling
decorated board
The ceiling and decorated board overlapping
part should be more than 25mm
ceiling
decorated board
model
AB182~282MCERA
AB302~482MCERA
10
holder
holder
A (mm)
B (mm)
240
135
295
140