14" (35.6 cm)
5"
(12.7 cm)
4-5/8"
(11.7 cm)
13" (33 cm)
2-1/2" (6.4 cm)
3-1/4" (8.3 cm)
3"
(7.6 cm)
3-3/8"
(8.6 cm)
H
4"
(10.2 cm)
Roughing-In for K-5264
• The drinking fountain complies with ADA requirements when the
rim is mounted no higher than 36" (91.4 cm) from the finished
floor (dimension H).
• The distance between the rim and the floor (dimension H) is 30"
(76.2 cm) for grade schools and 36" (91.4 cm) to 44" (111.8 cm) for
other buildings.
1. Prepare the Site
NOTE: Be sure to install sufficient backing to support the wall
hangers and anchor bolt.
Rough-in the supply and drain piping according to the
roughing-in.
Temporarily install a capped length of 1-1/4" and 3/8" pipe to
the drain and supply to extend a minimum of 2" (5.1 cm) beyond
the finished wall.
Install sufficient backing to support the wall hangers and anchor
bolt.
101024-2-AB
1-1/4" NPT Tap
13" (33 cm)
2-1/2" (6.4 cm)
6"
(15.2 cm)
3-1/4"
9-1/4"
(8.3 cm)
(23.5 cm)
7/8"
3/8" NPT
(2.2 cm)
Supply
7/16" (1.1 cm) D. Anchor
Screw Hole in Back
4
Floor
Kohler Co.