Acceptance test carried out by the responsible electrician prior to commissioning
Electric component:
Visual inspection
– Supply point correctly fused
– Main cable to local isolating switch 4 x
– Protected main connection boxes
– Sealing conductor lead-ins
– PE and other connection boxes safely connected
– Correctly connected conductor rail
– Conductor rail IP 4 x
– Correctly connected conductor rail
– Traverse IP 4 x
– Correctly connected control unit
– Ground screw (see 4.2.8.3 item )on bottom
of control unit installed
– Measurements according to EN 60204-1 / VDE 0113-1,
Chapter 18 Carried out by measuring instrument
(manufacturer, model, serial no.)
....................................................................Reading:..............................................................
....................................................................Reading:..............................................................
....................................................................Reading:..............................................................
....................................................................Reading:..............................................................
....................................................................Reading:..............................................................
....................................................................Reading:..............................................................
– Performance test:
Switch on main breaker and run a curing cycle.
See instruction manual.