Quartz Sleeve Installation And Replacement - PUR PUV15S El Manual Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Lamp Installation and Replacement (continued):
7. Re-pressurize the system by slowly opening the water inlet
valve (Figure 20).
8. Check the system for any leaks.
9. Plug Controller into the electrical outlet (Figure 21).
10. Ensure that the UV lamp is operating – the green power LED
light should be illuminated, the red lamp failure LED light
should be off and no audible alarm should be active.
11. The display will show the number of days until lamp replacement is required. If a new lamp was installed, press and hold
the button on the Controller for 10 seconds to reset the lamp-life countdown timer.
12. Allow UV lamp to warm up for a minimum of 2 minutes before flushing water through the UV chamber.

Quartz Sleeve Installation and Replacement:

Any mineral deposits or sediment build-up on the quartz sleeve will affect the system performance by decreasing the UV light
transmitted through the quartz sleeve into the water column.
The proper maintenance and replacement of the pre-filtration required for the UV system will reduce the accumulation of mineral
and sediment residue on the quartz sleeve. The quartz sleeve may be cleaned with a commercially available, non-abrasive, acidic
scale remover and a lint free cloth. Cleaning of the quartz sleeve should be done on a regular basis to ensure maximum system
performance. The amount of cleaning required will vary depending upon local water conditions and system pre-filtration.
All traces of the cleaning solution must be fully removed from the the quartz sleeve before it is reinstalled in the system.
Care should be taken to prevent any cleaning fluid from coming into contact with the inside surface of the quartz sleeve.
1. Depressurize UV chamber by turning off the inlet water supply and
open valve downstream of system. Then close outlet valve (Figure 22).
2. Unplug the Controller from the electrical outlet (Figure 23).
3. Allow at least 5 minutes for lamp to cool before removing (Figure 24).
4. Remove the VuCap
from the UV chamber and carefully
®
disconnect the UV lamp from the lamp connector harness.
5. Carefully remove the UV lamp from the quartz sleeve by gently
rotating the lamp free. Be sure to hold the lamp only by the
ceramic ends.
6. Drain water from the Stainless Steel UV Chamber.
7. Remove the retaining nut securing the quartz sleeve into the
UV chamber.
8. Remove the quartz sleeve sealing O-ring.
9. Remove the quartz sleeve and clean as noted above (Figure 25).
10. Insert quartz sleeve into the UV chamber. Quartz sleeves should
be replaced every 3 years for optimal performance.
11. Insert UV lamp into the quartz sleeve and attach the connector.
12. Slowly refill the UV chamber by opening the water supply just
enough to fill the chamber with water (Figure 26).
13. Check the system for any leaks.
14. Apply power to the UV system (Figure 27).
15. Ensure that the UV lamp is operating by verifying the
Controller green LED indicator is on and display is operational.
Figure 20
Figure 22
1
2
2
2
Figure 24
Figure 26
Figure 21
Figure 23
2
Figure 25
Figure 27
8

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Puv25sPuv15hPuv25h

Tabla de contenido