FIG. 4
4. TOP CABLE ATTACHMENT
Run the loop of the top cable with the pre-attached tension clip through the wheel of the pulley cap.
Attach the top cable to the hook of the locking net bolt.
FIG. 5
Top guide rope
5. NET SET UP
Stretch the assembled Net and poles across the playing area until the Net is taut. Press the Pole Anchors
into the ground with the poles touching the ground. Slip the poles onto the anchors. Holding the poles in the
vertical position, press the Guide Rope stakes into the ground at a 45º angle, 3 feet to 5 feet from the pole
and 3 feet to 5 feet apart. Make sure that the hooks on the stakes are facing away from the poles.
See FIG. 5 and 6.
NET200_037D
ASSEMBLY INSTRUCTIONS
Tension
Clip
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Bottom guide rope
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
BADMINTON SET
MODEL : NET200_037D
8
1
FIG. 4B
8
11
See FIG. 4A and 4B.
4
FIG. 4A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
www.themdsports.com