3
Leave up the cooker hood and hang
onto the wall bracket hook.
Chimney installation
Put the upper chimney into lower chimney. Then pulling
out the upper chimney upwards. Adjust to reach the
height required. Measure the appropriate height and dill
2×8 mm holes to accommodate the plate. Screw and
tighten the upper wall with 2 screws provided.
There are 2 methods for installation the chimney cover (see below pic for reference).
1
After drilled the 2 holes and fixed the hook, hang the chimney cover by matching
the both side lock (Pic 1).
2
After drilled the 2 holes and fixed the hook, install the chimney cover by locking
with 2 screws in both side holes (Pic 2).
4
Fix the one-way-valve to the air outlet
of the cooker hood. Then, attached the
exhaust pipe onto the one-way-valve.
EN
19