riversystems.it
riversystems.it
riversystems.it
7. STORAGE
At the end of the working season or if the machine is not used for a long period, it is necessary to:
riversystems.it
-
clean thoroughly the machine both inside and outside;
-
check it and, if necessary, replace the damaged or worn parts;
-
tighten all the bolts;
-
cover the machine after having stored it in an indoor and safe place.
It is in your best interest to find your grinding mill in perfect conditions when you resume working.
riversystems.it
8. DISPOSAL OF THE MACHINE
As far as the Waste Electrical and Electronic Equipment (WEEE) are concerned, please note that:
1. the WEEE shall not be disposed as general waste, but they shall be collected separately;
riversystems.it
2. for their disposal, please use the public or private collection systems foreseen by the local
regulations;
3. this appliance may contain dangerous substances: an improper use or an incorrect disposal
can have negative effects on human health and on the environment;
4. the improper disposal of the WEEE is prosecuted by the law.
riversystems.it
9. TECHNICAL SPECIFICATIONS
Dimensions (WxLxH)
Net weight
Input
riversystems.it
10. AVAILABLE SIEVES
SUPPLIED SIEVES
riversystems.it
Type of sieve
Holes Ø 2 – galvanised
Holes Ø 4 – galvanised
Holes Ø 6 – galvanised
riversystems.it
Holes Ø 8 – galvanised
riversystems.it
Copyright © 2019 River Systems - All rights reserved
riversystems.it
1. Unscrew the screws
that secure the hopper
to the central cylinder
and remove the hopper.
2. After having removed
the sieve, unscrew the
bolts that secure the
bin cover to the central
cylinder.
Remove
the
central
cylinder, uncovering the
motor compartment.
riversystems.it
riversystems.it
riversystems.it
Code
650P2,0
650P4,0
650P6,0
650P8,0
riversystems.it
riversystems.it
riversystems.it
MISTRAL
42x42x101 cm
7,3 kg
1200 W
SUPPLIED SIEVES
Type of sieve
Holes Ø 0,6 – st.steel
Holes Ø 0,8 – galvanised
riversystems.it
Holes Ø 1,5 – galvanised
riversystems.it
- 19 -
3. Remove the bolt (2) that
blocks the brush.
riversystem
4. Remove the plug (4) of the
brush from its pin.
5. Remove the worn brush.
6. Execute the same operation
for the second brush on the
opposite side (B).
7. Make sure that the new
brushes are assembled
correctly, as well as the other
parts of the motor.
Finally reassemble the mill with
care.
riversystems.it
riversystem
riversystems.it
Code
riversystems.
650P0,6
650P0,8
650P1,5
riversystems.it
EN
riversystems
riversystems
riversystems