Starting up the equipment
• Make sure there is enough water in the tank (2);
if not, top up with water as explained in section
"Water filling" (page 55).
• Check that the capsule lever (5) is closed.
• Press the button (13) to "ON". The On/Off general
light (14) goes on and the boiler starts heating the
water.
• Press one of the front options (11 or 12).
• Wait for the correct operating temperature to be
attained. This will be signaled by the front 3 LEDs
emitting a steady green light.
• The machine will then be ready to use.
Carefully check that during these operations the
lever is closed and the water tank is filled.
Before producing the first coffee
• Do not insert a capsule. Place a cup under the
dispense spout, press one of the extraction/pour
buttons (11 or 12) and draw a cup of hot water.
This operation is necessary to ensure that the machine
mechanism is correctly primed.
INSTRUCTIONS fOR USe
11
EN
57