Descargar Imprimir esta página

CAPITAL SPORTS Maliko Manual Del Usuario página 19

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Board Deflation Steps
1. Clear any water or debris out of the valve areas.
2. Slowly press down on the valve stem to start letting air out of the board.
There will be an initial burst of air, but that will slow down very quickly.
Once the air flow has slowed down, press the valve stem all the way
down and turn it clockwise to lock it into the "open" position.
Center Fin Installation
1
Slide fin base into fin box.
3
Insert fin retention pin through slot.
2
Slide fin all the way to back of the
fin box.
4
Correct fin installation.
EN
19

Publicidad

loading