REQUIREMENTS FOR SUCCESSFUL INSTALLATION
CAUTION:
DO NOT use drywall screws to secure fl anges to wall studs. Product damage will occur and will void the warranty.
Entire bottom support must be in contact with a fl at, level surface.
CAUTION:
◘
Read complete instructions before beginning installation.
◘
These instructions include suggestions for rough construction and plumbing installation that we believe to be reliable.
Local building codes vary and could supersede those suggestions. If you are not confident in your ability to perform
these tasks, contract out those tasks you need help with or use a professional installer.
◘
Confirm that your model will fit in intended location and plumbing fixtures are located where required before beginning
installation.
◘
Walls and sub-floor must be solid, plumb, and square.
◘
If installation surface is not level, use leveling compound or mortar bed for proper installation.
◘
Use drop cloth to protect bathtub from damage during installation.
◘
Do not install in areas where temperature may drop below 32ºF (0ºC).
◘
Allow product to reach room temperature for 30 minutes before installation.
◘
Two people recommended to install this product.
ROUGHING-IN
15-3/8"
16-3/4"
30-1/2"
◘
Rough plumbing must be installed before bathtub installation.
IMPORTANT!
If installing wall set, refer to wall set installation instructions for specifi c lumber sizes and placement.
Additional studs will be required and need to be installed at this point.
◘
For masonry construction, floor and walls must be framed to accommodate plumbing and installation.
14-5/8"
14-5/8"
13-7/16" to
center of drain
8"
60"
15-3/8"
8-3/8"
7-7/16"
12"
10"
3
3
Right side plumbing rough-in shown
Studs must
be plumb
and square.
P/N 27751 8/10