PÓSTER DE REQUISITOS PARA LAS INSTALACIONES: INSTALACIÓN DIVIDIDA
Technical Room
Additional Piping for Vacuum Pump and Blower
• Customer supplied
• Maximum length is 10 meters
• Pipe must be stainless steel (303 or 304 is recommended)
• Customer must supply welding personnel
Additional Power Cabling
• Customer supplied
Additional Signal Cabling
• Customer supplied
Additional Compressed Air Line
• Customer supplied
Additional Argon Gas Line
• Customer supplied
Argon Gas
Bulk Argon tank
1
▪ option for high argon demand sites
Argon cylinders
2
▪ use a high volume pressure reducer
▪ connect cylinders with auto-switching
manifold to ensure constant argon
supply during build
Compressed Air
Chiller power
separate from
ProX DMP 320
• 200 to 230 VAC
• 50/60 Hz
• 15 kVA
customer supplied/installed
Atmosphere
max
27° C (80° F)
min 16° C (60° F)
Room temperature
setpoint and stability
• set temperature between 18° C and 24° C (65° F and 75° F)
• temperature should be constant to ±2° C (± 5° F)
Coolant Hoses
▪ Included with 3D Systems-supplied chiller
▪ 1/2" barbed hose tting
CHILLER
Build Room
Argon
• customer supplied/installed
Compressed Air
• customer supplied/installed
Electrical Cable
• customer supplied/installed
Transformer
(Optional)
Control Cabinet
power panel
• 400 VAC
• 50/60 Hz
• 10 kVA
Room oxygen monitor
• recommended
• customer supplied/installed