PRINCIPLE OF OPERATION
Assembly:
4
1
BEFORE FIRST USE
Upon receipt of the goods, check the packaging for integrity and open it. If the packaging is damaged, please contact your
transport company and distributor within 3 days, and document the damages as detailed as possible. Do not turn the package
upside down! When transporting the package, please ensure that it is kept horizontal and stable. Please keep all packaging
materials (cardboard, plastic tapes and styrofoam), so that in case of a problem, the device can be sent back to the service
centre in accurate condition.
Disposing of packaging
The various items used for packaging (cardboard, plastic straps, polyurethane foam) should be conserved, so that the device
can be sent back to the service center in best conditions in case of problem!
INSTALLING THE APPLIANCE
Appliance location
The work surface where the device will be located must be suitable for the size of the appliance, please refer to the mea-
surements. The work surface must be levelled, dry, heat-resistant and at a fitting height from the ground to enable a proper
use of the device.
The power cord connected to the appliance must be properly grounded and correspond to the technical details.
OPERATION
1.
Device must be placed on stable work table, SMD rework gun must be placed into the holder.
2.
Fix the appropriate nozzle and connect the device to the power source.
3.
Turn on the device with the SMD rework switch (1), gun will start to heat. Display will show "---" which means that
the device is in "Stand by" mode.
4.
Set the desired temperature with buttons (3).
5.
Take out the gun from the handle, the air will start to flow.
6.
Set the desired airflow volume with knob (4).
7.
When the temperature will be stable, the device is ready to work.
8.
After work, the SMD rework gun should be placed in the holder and the device will start to cool. When the tempera-
ture falls below 100°C, the display will show"---". It means that device entered into "Stand by" mode.
9.
NOTE: It is forbidden to cover the air intake holes on the handle of a SMD rework gun during work. This may cause
serious damages of the fan and the heater!
5
3
2
EN
DE
1.
SMD rework station switch on / off
2.
SMD rework gun cable
3.
temperature setting buttons
4.
airflow volume adjustment knob
5.
SMD rework gun temperature display
9