ASSEMBLING THE BASE
1
Remove base cover.
3
Fill base with sand.
It is recommended to
use 90 kg / 200 lb of sand.
2
Insert standing tube .
4
Add water to wet the sand.
4
ASSEMBLING THE BASE
12
14
12
WARNING: Keep the standing tube straight!
Caution:
Remove the standing tube carefully (step 5) to avoid sand into
the center of the base shell.
Fill the base completely with 90 kg / 200 lb sand, then add water
to wet down the sand.
5
Remove standing tube .
12
5
J
6
Reinstall base cover.