Task List; Task 1: Unpacking; Packing List - FileCruiser VA2600 Guia De Inicio Rapido

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 59

TASK LIST

The basic hardware installation tasks for the FileCruiser VA2600 described in the guide
are the following:
"TASK 1: UNPACKING" on page 5
"TASK 2: MOUNTING FILECRUISER IN A RACK" on page 7
"TASK 3: MANAGEMENT CONNECTION" on page 11
"TASK 4: CONNECTING THE POWER" on page 13
"TASK 5: CONFIGURE FILECRUISER" on page 18
Also included in this guide:
"WARRANTY" on page 19
"CONTACTING TECHNICAL SUPPORT" on page 20
For configuration instructions, please refer to the Quick Configuration Guide.

TASK 1: UNPACKING

PACKING LIST

The FileCruiser box contains the following items:
FileCruiser VA2600
Hardware Installation Guide printed
* These items might be an optional feature in your region. Please contact your sales
representative to learn whether this is included or an option for your FileCruiser
VA2600.
FileCruiser VA2600 Hardware Installation Guide
5
3 x 1.5 m (4.9 ft) Power cords
Sliding rail assembly for rack
mounting*
Front panel bezel cover*

Publicidad

Tabla de contenido
loading

Tabla de contenido