Contact Information - Mettler Toledo PinMount SWC415 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 7
SWC415 PinMount™ Weigh Module » Installation Guide
Options for Securing the Weigh Modules
7
»
BOLT
the weigh module:
OR
Bolt top plate
to tank leg
Tank Leg
Concrete/Foundation
Mounting plate surface must be level to 1/2° or
All weigh modules must be in the same plane within 3mm (1/8").
- OR -
LEVEL AND GROUT
OR
Bolt top plate
to tank leg
Bolt base plate
Shim as
needed
Leveling
Adjustment Nut
Expansion
Anchor
1mm
(1/16")
100mm (6")
Installation Tips and Precautions:
• Never cut the load cell's cable or extend its length.
• Avoid moisture and dust.
• Ensure voltage stability – use a regulated power supply.
• Avoid overload and shock.
• Ensure good grounding.
• For hazardous area installations in Europe, refer to the enclosed
instructions (30104376 / 175389R).
- OR -
the weigh module:
Tank Leg
Weld pitch: 3" / 75mm, 2" / 50 mm between welds on all four sides
Weld sizes:
Bolt base plate
Nonshrink
Epoxy Grout
Anchor
Insert
Concrete/Foundation
J-Bolt
Download Installation Guide:
Installation Guide is available in:
English, German, Spanish, French,
Italian, Dutch, Portuguese, Swedish,
Danish, Norwegian, Polish, Czech,
Hungarian, Russian, Turkish
www.mt.com/ind-downloads-415pinmount
WELD
the weigh module:
• Remove load cell from weigh module before welding.
• Ground wire of welder must be as close to the weld
seam as possible to ensure proper grounding.
Contact authorized METTLER TOLEDO technician for
proper removal and re-installation of load cells.
7.5-22t modules
20-50t modules
0.24" / 6mm fi llet
0.32" / 8mm fi llet
1" / 25mm long
1" / 25 mm long
Tank Leg
Contact authorized METTLER TOLEDO service
technician to activate the weigh modules for
startup and calibration.

Contact Information:

www.mt.com/contact
© 2016 Mettler Toledo GmbH, Switzerland
10/2016 | 30366367B

Publicidad

Tabla de contenido
loading

Tabla de contenido