Preparation and Safety Information
IMPORTANT-READ THROUGH ENTIRE INSTRUCTIONS BEFORE BEGINNING INSTALLATION
Safety:
Read and understand the warning on your stepladder and make sure the ladder is in good working
order.
Examine all tools needed to insure they are in proper working order before starting.
Power tools that are not internally grounded require power cords and extension cords with a ground
prong.
Always wear eye protection when drilling or installing parts.
HyLoft
components are made of metal so beware of any sharp edges and do not let any components
make contact with electrical current during installation.
DO NOT install more than one
unit on the same framing members.
HyLoft
This unit must be installed on at walls into wall studs. Do not attempt to install on drywall or
uneven surfaces.
Each Tire Loft can hold a maximum of 400 lbs. (181 kg). Be sure to distribute the load evenly.
Maximum inside opening is 58".
Preparation:
The
HyLoft
unit can be installed in any area of garage, provided there is adequate space. When
possible install so that all three sides are accessible for convenient loading.
Take care not to block attic or crawl space access, or lights.
Clear the area where the
HyLoft
unit is to be installed, and don't leave autos parked under the unit
during installation.
Locate any gas, electrical, and plumbing lines in the garage before drilling holes in the drywall.
Installation Time: 30 minutes or less.
NOTE: We refer to Wall Studs throughout the instructions. Wall Studs are also called Framing
Members.
Knape & Vogt
2700 Oak Industrial drive Ne
Grand Rapids, MI 49505
1-800-253-1561
For more information and frequently asked questions, visit the Hyloft web site:
www.Hyloft.com