AIR FOR COMBUSTION
AND VENTILATION
Continued
Ventilation
Grills into
Or
Adjoining
Remove
Room,
Door into
Option 1
Adjoining
Room,
Option 3
Figure 2 - Ventilation Air from Inside
Building
ventilation Air From Outdoors
Provide extra fresh air by using ventilation
grills or ducts. You must provide two perma-
nent openings: one within 12" of the ceiling
and one within 12" of the floor. Connect these
items directly to the outdoors or spaces open
to the outdoors. These spaces include attics
and crawl spaces. Follow the National Fuel
Gas Code, ANSI Z223.1/NFPA 54, Air for
Combustion and Ventilation for required size
of ventilation grills or ducts.
IMPORTANT: Do not provide openings for
inlet or outlet air into attic if attic has a thermo-
stat-controlled power vent. Heated air entering
the attic will activate the power vent.
Outlet
Air
Outlet
Air
Inlet
Air
Inlet Air
Figure 3 - Ventilation Air from Outdoors
121881-01B
12"
Ventilation Grills
Into Adjoining Room,
Option 2
12"
Ventilated
Attic
To Attic
To
Crawl
Space
Ventilated
Crawl Space
www.desatech.com
INSTALLATION
NOTICE: This heater is intended
for use as supplemental heat.
Use this heater along with your
primary heating system. Do not
install this heater as your pri-
mary heat source. If you have a
central heating system, you may
run system's circulating blower
while using heater. This will help
circulate the heat throughout the
house. In the event of a power
outage, you can use this heater
as your primary heat source.
WARNING: A qualified ser-
vice person must install heater.
Follow all local codes.
CHECK GAS TYPE
Use only the correct type of gas (natural or
propane/LP). If your gas supply is not the
correct gas type, do not install heater. Call
dealer where you bought heater for proper
type heater.
WARNING: This appliance is
equipped for either natural gas
or propane/LP gas but not both.
Gas type is indicated on the rat-
ing plate. Field conversion is not
permitted.
INSTALLATION ITEMS
Before installing heater, make sure you have
the items listed below.
• for propane/LP gas, external regulator
(supplied by installer)
• piping (check local codes)
• sealant (resistant to propane/LP gas)
• equipment shutoff valve *
• ground joint union
• sediment trap
• tee joint
• pipe wrench
• for natural gas, test gauge connection*
* A CSA design-certified equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. The optional CSA design-
certified equipment shutoff valve can be purchased
from your dealer. See Accessories, page 26.
7