Página 2
1 PREPARATION Remove Rubber Washer (1A), Friction Washer (1B) and Locknut (1C) from Drain Body (1D). 1 Español: PREPARACIÓN Retire la arandela de caucho (1A), la arandela de fricción (1B) y la contratuerca (1C) del cuerpo de drenaje (1D). 1 Français : PRÉPARATION Retirer la rondelle en caoutchouc(1A), rondelle de friction (1B) et l’écrou de blocage (1C) du corps de bonde (1D).
Página 3
2 BODY INSTALLATION The Drain Body (2A) can be installed with or without Rubber Seal (2B). If Drain Body (2A) is installed without Rubber Seal (2B), apply a small bead of plumber’s putty underneath the Flange (2C) and around Drain Opening (2D). Use PTFE plumber’s tape to all threaded fittings according to manufacturer’s instructions.
Página 4
DRAIN/STRAINER DRAIN/STRAINER LESS OVERFLOW WITH OVERFLOW 972-103* 972-104* English Español Français Letter Designates Finish La Letra Indica el Terminado La Lettre Designe La Fini Polished Chrome Cromo Pulido Chrome Poli Black Negra Noire PVD Brushed Gold PVD Oro Cepillado PVD Or Balayé...