Descargar Imprimir esta página

Barrette BOERBOEL EPN-5606 Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

Determine Gate Opening:
1
Gate opening is determined by width of gate plus
clearance for hinge (
rod (Fig. 1) (see latch instructions for details).
Installing the Hinge:
2
Install the hinge on the rail/gate upright (Fig. 2).
The gate can be adjusted to swing 180 degrees with
either a manual or self-closing feature (Fig. 3).
NOTE:
Pilot holes should not be drilled all the way through
gate upright or rails. Mark a pilot hole using the
hinge and drill with
short side of hinge.
Mount Hinges on Gate:
3
Mount both hinges to the gate using (6) 1
Phillips combo screws per hinge (4 on front of hinge
and 2 on side) (Fig. 4).
NOTE:
Cut two 2" spacer blocks to help support the gate
prior to installing hinges to post.
⁄ ") plus clearance for latch/drop
1
1
1
2
2
⁄ " bit. Also drill pilot holes on
3
3
3
32
32
⁄ " #2 square/
1
1
1
2
2
Fig. 1
Determine
location and gate
opening before
installing fence.
Fig. 2
Upright
Upright
Upright
Upright
Upright
Upright
Rail
Fig. 3
180º
Fig. 4
3

Publicidad

loading