Installation
INSTALLATION
Follow the Add-a-Jon installation instructions and all
applicable national or local electrical and plumbing codes
for a good installation. Thorough planning is a must. Get
the right tools for the job before beginning, and make a
specific and thorough plan. Many localities will require
you to make drawings, obtain a building permit and/or
have your work inspected. Be prepared; read all instruc-
tions that come with this product before installation.
Retain this owner's manual for future reference.
Parts and Basic Tools Needed for the Job:
(Some of the tools may not be needed depending on the
type of installation chosen.)
• 2" PVC Close Nipple
• 2" 90° PVC Slip Elbow
• 2" Slip Union
• 2" Slip x 3" NPT Reducer Bushing
• Pipe Glue (to match pipe you are using - probably PVC
or ABS cement)
• Vent Pipe (see Step 14, Page 6)
• 5/16" Nutdriver
• 7/16" and 1/2" Wrenches
• Carpenter's Level
• Center Punch
• Cloths, Rags
• 4" Expandable Plumber's Plug
• Hacksaw
• Hammer
• Hole Saw (3")
• Marker
• Flat Screwdriver
• Sponge
• Strap Wrench
• Tape Measure
• Wallboard Knife
See Figure 1 for the basic plumbing layout.
For parts or assistance, call Flotec Customer Service at
Discharge Pipe
Figure 1: Piping Components and Layout.
1-800-365-6832
Check Valve
Purchase Separately:
2 - 2" x Close Nipples
1 - 2" Slip Union
1 - 2" Slip 90° Elbow
Adapter
Foam
Gasket
5159 1005
4