Glacier bay HD67771W-6001 Guía De Uso Y Mantenimiento página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
9
Checking the operation of the
pop-up
Operate the lift rod (O) up and down to verify
that the stopper (F) opens and closes correctly.
10
Making the water supply
connections
NOTE: The hot side inlet tube is indicated by a label.
If the label is not present, the hot supply tube is the longer
of the two inlet tubes.
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
NOTE: Before tightening the faucet connector to the water
supply, apply a second wrench to the supply tube tting.
This will prevent the supply tube from moving or twisting
when tightening the faucet connector. Do not overtighten.
1
3
8
O
F
2

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido