145*210MM/莫思妮,16156000A25922 MY-GD20D4W__310100JHJ 说明书/YDX,20170622
Installation Instructions
Installation of Windpipe
2
1.Align the boss of windpipe
fastener with the "
insert to the end.
Installation of hanging ironing board
3
Schematic diagram of front installation
Schematic diagram of front installation
2.Rotate the fastener clockwise,
"and
and lock by aligning the boss
with the"
Align the fastener with the first and
second support rods and set at positions.
Shorten the supporting rod to suitable height
" .
GB
GB-06