Fig.1: Put base cover (C) into posts (A1/A2/A3), then attach base (B) to post posts (A1/A2/A3), with screw
(AA) and flat washer (BB).
Fig.2: Fix long screens and short screens (H/I) to posts (A1/A2/A3).
Fig.3: Attach the slanting bar 1 (D) to the connector 2 (F2), then attach the hook (M) to the connector 2
(F2).
Fig.4: Fix
the slanting bar 1
(EE).
Fig.5:
Insert the slanting bar 2 (G) into the connector 1 (F1)
Fig.6:
Put the big canopy (N) on big top, do not fully spread. Then, insert the slanting bar 2 (G) into the slanting bar
1 (D).
Hardware Pack 2
No.
FF
GG
JJ
(D) to the posts (A1/A2/A3) with screws (DD), flat washers (BB) and nuts
Description
M6X20 Bolt 1
M6X15 Bolt 2
Nail ¢6X230
Qty
4 PCS
4 PCS
8PCS
Image