Existing Construction Assembly Instructions - Utilitech 7105-04-L Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NEW CONSTRUCTION ASSEMBLY INSTRUCTIONS
8.
Place glass globe (C) up to the light/rim assembly (B).
Align the tabs on the light/rim assembly (B) with the indents
on the glass globe (C). Push glass globe into the light/rim
assembly (B) and rotate to lock into place.

EXISTING CONSTRUCTION ASSEMBLY INSTRUCTIONS

Installing the fan housing in an existing building REQUIRES AN
ACCESSIBLE AREA (attic or crawl space) above the planned
installation location and existing duct and wiring.
BEFORE INSTALLATION – Turn off power source. Review all
safety precautions. Remove existing fan.
1.
Measure the opening to ensure it is large enough to
accommodate the new fan housing (8-7/16 in. x 8-1/4 in.).
2.
If this fan is not replacing an old fan, be sure to cut a
8-7/16 in. x 8-1/4 in. opening for the fan housing.
3.
Place the fan housing (A) next to a ceiling joist or wall stud
(3.1). The fan housing (A) should be level and perpendicular
to the joist or wall stud (3.1). Allow for thickness of ceiling
board (3.2) used in your application. DO NOT flush mount
to joist or wall stud (3.1). Bottom of fan housing (A) should
be flush with the ceiling board (3.2).
8
C
1
2
3
3.1
3.2
8
B
A
3.2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0785737

Tabla de contenido