Before You Start; Unpacking Instructions - Quadient DS-75 Desembalar Y Instalar

Ocultar thumbs Ver también para DS-75:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 15

Before you start

1.
Verify that the system is suitable for the local mains voltage. Refer to the type plate.
2.
The power connection must be easily accessible. Place the system near a socket
outlet with protective earth connection.
Warning
The earth connection is essential for safety.

Unpacking instructions

1.
Remove the two blocks packaging material on top of the system.
2.
Verify that the following parts are available in the box:
-
inserter system (A)
-
a box with document feeders (E)
-
a box with one catch tray and one slide
1
(B)
-
a power lead (C)
-
a bag with three spare moistening brushes
and a spare moistening cloth (D)
-
optional accessories (maxiFeeder™, side
exit)
3.
Remove the box from the tray.
1. If the high capacity vertical stacker is part of the delivery, the catch tray and slide are not
contained in the box.
A
D
C
E
B
1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

M5500

Tabla de contenido