Descargar Imprimir esta página

Halls Greenhouses Qube Manual De Instrucciones página 4

Publicidad

May we congratulate you on your new greenhouse
GB
DEAR CUSTOMER
Congratulations on purchasing your new greenhouse.
It is important that you follow these assembly
instructions step-by-step.
The assembly instructions are a combination of text
and illustrations. The profiles are packed in separate,
numbered packs corresponding to their order of use
in the instructions. Assemble one pack at a time. All
nuts, bolts and fittings are contained in one box.
Each pack is specified on separate lists of
components.
All detailed illustrations are marked with the
following symbols:
Seen from the inside
Seen from the outside
SOME SAFETY PRECAUTIONS
Only carry out assembly in dry and calm
weather
Always wear work gloves when installing the
glazing. Greenhouse glass has sharp edges,
especially if it breaks
Assistants and especially children must be
warned that broken glass presents a safety
hazard. Pick up all broken glass at once and
remove it with care
Any ladders used must be placed on a level
surface.
Make sure you have an assistant to help you.
PAGE 12: TOOLS
Assembling the greenhouse requires the tools shown
on page 12.
PAGES 14-15: BASE
No base is included with this product. However, an
original base can be purchased separately. This base is
easy to construct and will guarantee you a stable base
for your greenhouse.
If you construct your own base, the specified
dimensions must be external dimensions.
Anchor holes must be deep enough to extend below
the frost line (800mm). Place the assembled base with
anchor legs over the holes so the anchor legs fit into
the holes; it takes about 75-90 litres of concrete to fill
up the holes.
Make sure the base is completely level and square.
To square the base, make sure the two diagonal
measurements are identical (see page 14).
PAGE 16-39: ORDER OF ASSEMBLY
Position the components as shown on the illustration
and assemble in the order shown on the pictures.
1
2
3
etc..
Do not fully tighten the nuts until the entire
subassembly has been assembled.
Upon seeing this icon, note you may need to loosen
and then thighten bolts in order to ease assembly.
PAGE 42-45: DOORS AND WINDOWS
Window glass must be fitted at the same time as
the profiles. Glass for the door must be fitted after
assembly of the door.
PAGES 40-45: FITTING OF GLASS
Important before assembly!
Make sure that the gables and sides are level and
square and that door(s) and window(s) open and
shut perfectly.
The best order of assembly for the glazing is as
follows:
Roof – Gables – Sides – Doors – Windows
Apply 20-1230 to profiles marked with a dotted line
on the illustration. Fit one piece of glass at a time.
80,81,82,83,84 strips are fitted as shown on pages
40-43.
Place the upper part of the strip under the aluminium
profile along the full length of the sheet and then
click the strip into position from above.
www.hallsgreenhouses.com
Please refer to website for the most up to date instruction
Your greenhouse is now fully assembled. However,
please note the following:
MAINTENANCE
WINTER PROTECTION
If you anticipate snow during the winter, we
recommend the following winter precautions:
WATER AND CONDENSATION
Please note that your greenhouse is not like a
conservatory, for example, and that you should
therefore be aware that the greenhouse may leak
during or after precipitation and that condensation
will occur on the inside of the greenhouse. Good
ventilation will help prevent condensation.
INSURANCE
Please note that not all insurance companies cover
greenhouses automatically. Please contact your
insurance company to ensure that your greenhouse
is covered.
GUARANTEE
Juliana greenhouses come with a 12-year guarantee,
covering the replacement or repair of faulty parts.
The guarantee does not cover polycarbonate, glass,
transport, assembly, freight, etc.
Juliana greenhouses come with a two-year guarantee,
covering painted parts, if any. Please note that
suspension of the profiles may leave marks in the
paint.
The guarantee will become void if the greenhouse is
not assembled in accordance with these instructions
COMPLAINTS
All our greenhouses are built to the highest quality
standards. However, should you find any defects,
please contact your dealer immediately. When
describing the defect, please state the greenhouse
model and component number.
A list of components per package can be found just
inside the rear cover which provides all component
numbers.
Suspension marks and unpainted ends on painted
profiles, if any, will not be visible after assembly of the
greenhouse.
Congratulations on your new greenhouse! We hope it
will bring you many years of gardening pleasure.
B
USA
Grease the doors (hinges and locks).
Keep the gutters free from leaves, etc.
Adjust the windows as necessary.
Replace any broken glass.
Clean the greenhouse with disinfectant before
and after the growing season.
Support the apex of the roof in the middle.
Remove any deep snow from the roof.
Take precautions to prevent snow falling from a
tree or roof, for example.
Remove the cylinders for the automatic window
openers, if fitted (optional extras).
Secure the door(s) and window(s) to prevent
wind damage to the greenhouse.

Publicidad

loading

Este manual también es adecuado para:

833083288329