Descargar Imprimir esta página

Rousseau WS Serie Guía De Montaje página 2

Publicidad

Shelves Assembly
If shelves are required between two
drawers or between a drawer and a
door, read the following instructions.
If not required, go to locking bar
assembly.
A.
Remove the
drawers from the
cabinet.
B.
If necessary,
remove the glides.
C.
Insert the shelves
into the cabinet
and secure them
with 2 tapping
screws 12x1/2" at
the front.
Attention
Shelves to be
position according
Posición trasera
to need:
-Front position
between two
drawers.
Rear position
Posición trasera
-Rear position
between a drawer
and a door.
Locking Bar Assembly
If locking bars are required between two drawers, read
the following instructions.
rousseaumetal.com
1-800-463-4271
A
B
Lock without shelf
Cerradura sin anaquel
para el cajón superior
Front position
Side view
Vue de côté
1
2
Side view
Vista de lado
C
for top drawer.
Drawer
Cajón
Drawer
Cajón
Si se desea instalar barras de cierre entre dos cajones,
seguir las instrucciones siguientes:
Drawer
Cajón
Drawer
Cajón
Page/Página 2/2
Anaqueles - Montaje
Si se desea instalar anaqueles entre dos
cajones o entre un cajón y una puerta,
seguir las instrucciones que se encuentran
a continuación.
A.
Retirar los cajones
del gabinete.
B.
Si fuera necesario,
retirar los rieles.
C.
Colocar los
anaqueles y fijarlos
en su lugar con dos
1
tornillos
autorroscantes
2
12x12" en el frente.
ATENCIÓN
Ubicar los anaqueles
según el uso:
Tapping screw 12x1/2"
-Posición frontal, entre
Tornillos autorroscantes
dos cajones.
12x1/2"
-Posición trasera,
entre un cajón y una
puerta.
Door
Puerta
Barra de cierre - Montaje
Lock without bar
for top drawer.
Cerradura sin barra para
el cajón superior.
Lock with bar for
the other drawers.
Cerradura con barra
para los otros cajones
Tapping screw 12x1/2"
Tornillos autorroscantes
12x1/2"

Publicidad

loading