1 - Identifi cation plate
2 - ON/OFF switch
3 - Speed control
4 - 29 mm Ø suction port
5 - Hookit™ pad
6 - Disc pad fi xing screws
7 - Back-up pad Allen key
8 - Motor ventilation slots
9 - Filter bag and adaptor
Before starting-up the tool, ensure that:
- the packaging is complete and does not show signs of having been damaged during storage or transport;
- the tool is complete; check that the number and type of components comply with that reported in this instruction booklet;
- the power supply and socket outlet can support the load reported in the table and that indicated on the tool identifi cation plate reproduced and
explained on page 5.
Fit the dust bag (9) if required.
MOUNTING THE BACK-UP PAD
1. Place the back-up pad (5) with the screw in the centre (6) (fi g. 1);
2. Slightly turn the back-up pad (5) until it is fi xed to the screw as in (fi g 2);
3. Tighten the screw using the supplied allen key (7) (fi g. 3). Do not tighten the back-up pad screw if it is in the wrong position (fi g. 4);
4. To remove, follow the same procedure in reverse order.
FITTING ABRASIVE PAPER DISCS
Press the abrasive paper disc onto the pad ensuring that the holes in the paper coincide with extraction holes in the pad.
Ensure that:
- the power supply conforms with the characteristics of the tool;
- the power supply cable and plug are in perfect condition;
- the ON/OFF switch works properly, test with the power supply disconnected;
- all the parts of the tool have been assembled in the proper manner and that there are no signs of damage;
- the ventilation slots are not obstructed (8);
- the tool must be connected to a suitable and effi cient dust extraction system (4);
- the dust bag (9) is empty and not damaged.
- Starting: push the slide switch (2) forward; if the tool is to be locked in the ON position, apply pressure to the front part of the slide switch at the same time.
- Stopping: release the slide or, if locked in position, apply pressure to the back part of the switch and allow it to return to the stop position.
3M Instruction Manual
75-078_ROSander.indd 5
75-078_ROSander.indd 5
PARTS OF THE TOOL
INITIAL TOOL RECEIPT CHECKS
ASSEMBLING THE TOOL
BEFORE STARTING THE TOOL
STARTING AND STOPPING
3
EN
12.03.2010 12:45:56
12.03.2010 12:45:56