Descargar Imprimir esta página

Zoeller 1104-0082 Manual De Usuario página 13

Publicidad

TESTING
1. Connect remaining discharge pipe into main waste
line to sewer or septic tank. Connect inlet piping as
required for the installation and connect vent pipe
according to local, regional, and state codes. Use
additional check valve (not included) as required by
codes.
2. Connect pump power supply cord to a receptacle
protected by a ground fault circuit interrupter (GFCI).
3. Fill the basin (B) with water to check operation. The
pump will start when the water level has reached the
switch "on" level.
1
Vent Pipe
2
3
13
Main
Waste Line
Discharge Pipe
Inlet
Pipe
GFCI Protected
Receptacle
B
On Level

Publicidad

loading