Pentair Pentek Solar Drive Operation - Pentair PENTEK PSD25PB Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pentair Pentek
Once the Pentair Pentek Solar Drive controller is wired to the solar source, AC source and a
motor load, and the DIP switches settings are configured to match the motor specification,
then the Pentair Pentek Solar Drive is ready for operation.
AC Motor
Pump
Water Tank
Startup:
When starting the Pentair Pentek Solar Drive for the first time:
1. Make sure that the ON/OFF toggle switch is in the OFF position.
2. Turn the AC switch (on the right side of the Pentair Pentek Solar Drive) to the ON
position to provide AC power to the Pentair Pentek Solar Drive.
3. Power up the Pentair Pentek Solar Drive from solar PV (if available) by switching the
solar DC disconnect to the ON position.
4. Once both solar PV and AC source power are provided to the Pentair Pentek Solar
Drive turn the bottom toggle switch to the ON position to start the motor load.
The Pentair Pentek Solar Drive will check its motor connections using built-in open and
short circuit protections. If one of the motor leads is not connected or if there is a short in
the motor connections, the Pentair Pentek Solar Drive will show a warning message using
indication LEDs (see page 17 for LED Indicators).
14
Solar Drive Operation
*
Pentair Pentek Solar
Drive PSD25PB
ON/OFF
Toggle Switch
Level Switch
Figure 17: Solar Water Pumping System Diagram
AC Switch
DC
Disconnect
AC Source
PV Solar Array
P1063 (10-03-19)

Publicidad

Tabla de contenido
loading

Tabla de contenido