Ingeteam
Connect as shown in the following figure, installing current transformers on each phase.
See Section "Appendix 2: Current Transformer" for further information on the transformers.
The wattmeter must be installed downstream from the power consumption and production
installation.
RS-485 communications are as indicated in the following table.
You must connect the end of line resistors between connection points 41 and 42.
See Section "2.4. Description of Connection Points" for information on the connection with
INGECON EMS Manager.
Consult the accessories manual for communication via RS-485 for more information on the RS-485
wiring.
Lastly, power the wattmeter as indicated.
Configuration
This section includes the wattmeter configuration parameters required to ensure it operates correctly with the
INGECON EMS Manager.
1.
Supply power to the Wattmeter from the
electrical grid.
2.
Choose position 1 using the selector.
40
1
3
5
7
8
L1
L2
L3
N
Connection
41
42
43
55
N
L
9
10
11
12
13
Signal
RS-485 A (-)
RS-485 B (+)
GND
57
230 VAC
AAX2022IQM01_ - Installation and Operation Manual
Appendix 1: Wattmeter