Final Assembly
20.
Control the vertical line of the whole stair and, if necessary, correct it by moving the support N16 (fig. 1).
21.
Disassemble the first tread (L19 or L20) and drill the floor with a D. 14 mm (
present holes on the support N16 (fig. 1).
22.
Insert the parts C39 and tighten completely (fig. 1).
23.
Reassemble the first tread (L19 or L20) and fix on the floor, in relation to the first baluster (C12),
the part F01, by drilling with a D. 8 mm (5/16") tip. Use the parts B11, B12, B83 and B02 (fig. 1).
24.
Insert the baluster (C12) and tighten the part B02 (fig. 1).
KARINA
35/64") tip in relation to the