Connecting The Unit - H-P Products Vroom Instrucciones Para Instalar

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Connecting to the Vacuum Line
"Through the wall" installations
ATTENTION: Do not glue
the vacuum line to the
black Vroom fitting on
the unit: it is a friction fit
for easy removal.
With the unit in
place, trim out the
stub connected to
vac system by using
tubing to tie into the
Vroom.
Dry fit your assembly with the escutcheon plate (label
side in hole) and wire in place (the escutcheon plate
is notched for the wire
to run through it along
side the tubing). Use
a combination of short/
long 90º or 45º fittings.
Glue and assemble your
fittings/tubing and attach
to the trunk line. Do not
glue the vacuum line to
the fitting on the Vroom.
Attach the low voltage
wires from the Vroom to
the low voltage wires
coming from the trunk
line using wire nuts.
Push any
excess wire
through the
escutcheon
plate.
Properly installed unit
To test the unit,
simply lift the
handle out of
the docking
station until you
feel the switch
engage (90
degrees). This
will turn on the
central vacuum
unit and activate
the Vroom.
6
Step
1
Step
2
Step
3
Escutcheon
plate
"Floor" & "Retrofit" installations
It is always best to accurately measure for drilling
considering all possible obstacles. Drill a pilot hole with
1/8" bit (long) and check from lower level to make sure
you will be clearing those obstacles. Make sure you
have access to the trunk line and that there is enough
clearance for the tool rack and adjustable wand.
ATTENTION: Do not glue the vacuum line to the black
Vroom fitting on the unit: it is a friction fit for easy removal.
Locate the path for your vacuum line from the trunk line
and make reference marks for drilling. Make sure there
is enough clearance for tool rack & accessories. Drill a
pilot hole to ensure a clear path below the cabinet.
Step
1
Using a hole saw bore a
2-1/4" hole through the
cabinet and the floor.
Dry fit your assembly with
the escutcheon plate (label
side in hole) and wire in
place (the escutcheon plate
is notched for the wire
to run through it along
side the tubing). Remove
your dry fit assembly, glue
assembly and attach to the
trunk line. Do not glue the
vacuum line to the fitting
on the Vroom. Attach the
low voltage wires from the
Vroom to the low voltage
wires coming from the trunk
line using wire nuts.
Properly installed unit
Check underneath to
ensure there are no
obstructions before
drilling.
Step
2
Step
3
To test the unit,
simply lift the
handle out of the
docking station
until you feel the
switch engage (90
degrees). This will
turn on the central
vacuum unit and
activate the Vroom.

Publicidad

Tabla de contenido
loading

Tabla de contenido