OVE GRANADA 60 Instrucciones De Instalación página 14

Ocultar thumbs Ver también para GRANADA 60:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1-2. Using the plastic screws on the wall track (E), adjust the level of the shower frame. Also, make sure it fits
snuggly between the 2 walls.
Note: A total of 8 plastic screws on the wall track (E) will help you adjust the level of the shower frame
3. Mark the position of the holes of the wall tracks (E) on the wall.
4-5. Remove the shower frame and drill guide holes with a 1/4"(6mm) drill bit.
6-7. Insert the wall anchors (AA) into the wall and put back the shower frame in place.
8. Replace the shower frame back on the base, and fix the shower frame onto the wall using screws (BB).
5
ø1/4"
6mm
WALL TRACK INSTALLATION
and make it snuggly fit between the 2 walls.
6
AA
1
3
7
14
2
4
8
BB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

667450

Tabla de contenido