PARTS LIST FOR ASSEMBLING
10
1. Head Hinge
2. Sliding Tube
3. Slide Stopper
4. Sliding Support Tube
5. Crank hole for moving umbrella pole up and down
6. Crank hole for opening and closing umbrella
7. Crank Handle
8. Lower Umbrella Pole
9. Locking Ring
10. Umbrella Canopy
11. Nut
12. Standing Tube
13. Fixed Ring
14. Base
Note: Parts 11-14 are packed in box 2 of 2.
1
2
3
4
13
14
2
ASSEMBLING THE BASE
5
6
7
8
9
11
12
Fill base with sand.
It is recommended to
use 90 kg / 200 lb of sand.
1
Remove base cover.
3
3
2
12
14
Insert standing tube .
12
4
Add water to wet the sand.