msr_0444_Net_Media_Center:Layout 1
STEP 6
A. After securing the enclosure between studs, place the protective
cover back onto the enclosure. The protective cover helps maintain
the enclosure clean and free of debris during the rest of the installation.
B. Install the drywall. The drywall application should be flush with
the front of the enclosure.
A.
Despues de aseguar la caja enter postes, remplace la cubierta proterectora para
protejer la caja de suciedad y escombros.
B.
Instale el drywall. El drywall debe estar al nivel de el frente de la caja.
3/7/2008
3:24 PM
Page 7
Installation
Instalacion
7