Broan-NuTone ULTRA XN110H Guia De Instalacion página 5

Ocultar thumbs Ver también para ULTRA XN110H:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Page 5
New Construction Installation
5
Connect Wires and Install Knockout Plate
• Run 120VAC electrical wiring to the installation location.
• Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag.
• Connect wires as shown in wiring diagram.
STANDARD OR MULTI-
FUNCTION WALL SWITCHES
SENSOR/
CONTROL
BLK
WHT
120 VAC
LINE IN
GRD
BLACK
WHITE
SENSOR
MANUAL
CONTROL
ON
SWITCH*
SWITCH*
* purchase separately
Attach cable clamp to Knockout
1
Plate. Knockout Plate mounts to
outside of Housing and may be
oriented as desired.
2
Connect wires
MANUAL-ON
RED
ORANGE
BROWN
GROUND
(green or bare)
SWITCH BOX
120 VAC
LINE IN
14/3
(IF ALL
WALL SWITCH
OPTIONS
ARE USED)
RED
BLK
WHT
GRD
RECEPTACLES
KNOCKOUT
PLATE
XN110H Installation Guide
3
4
Screw from
Parts Bag
RED
FAN
BLK
ORG
SENSOR/
CONTROL
BRN
WHT
• See OPERATION section on page 12
for details.
• SENSOR/CONTROL switch turns
humidity control on for automatic
operation and off for fan cleaning and
maintenance purposes.
• MANUAL-ON switch directly turns fan
on/off.
• MANUAL-ON switch is not required to
manually turn fan on (see page 10).
• SENSOR/CONTROL switch may be
located where it is not easily accessed
for everyday usage; it may need to
be labeled and located where it can't
be turned on without being seen from
fan to comply with local and national
codes.

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido