6. seCuRe bAse FeeT:

6. SECURE BASE FEET:
A. Depending on the model purchased, your base feet will
either fit onto the outside of the leg pole, or slide into the
A. Depending on the model purchased, your base feet will either fit onto
the outside of the leg pole, or slide into the bottom of the leg pole. After
bottom of the leg pole.
installing the base feet line up the holes in the leg to the holes in
B. After installing the base feet, line up the holes in the leg to
the feet and secure with the hardware indicated in Detail G.
the holes in the feet and secure with the hardware indicated
in Detail G.

7. INsTAll AugeR ANCHoRs:

7. INSTALL AUGER ANCHORS:
A. Anchors must be placed inside shelter. Start at the corners
of the shelter. Insert a ¾" pipe or steel rod, through the eyelet
A. Start at the corners of the shelter. Insert a ¾" pipe or steel rod,
of the auger and screw the anchor into the ground. (If ground is
through the eyelet of the auger and screw the anchor into the
too hard, dig a hole with a shovel or post hole tool.)
ground. (Dig a hole with a shovel or post hole tool if ground is too
hard.) Optional: Fill with cement.
OPTIONAL: Fill with cement.
B. Space out the remaining anchors evenly along the length of
B. Space out the remaining anchors evenly along the length of the
the shelter. Screw the anchor into the ground until the eyelet is
shelter. Screw the anchor into the ground until the eyelet is sticking
sticking out of the ground by 1-2" so it can be anchored to the
out of the ground by 1-2" so it can be anchored to the legs.
legs.
C. Wrap the cable provided through the eyelet of the anchor and
C. Wrap the cable provided through the eyelet of the anchor
around the frame as indicated in Detail H. Secure the cable with
and around the frame as indicated in Detail H. Secure the cable
the clamps provided.
with the clamps provided.
D. Repeat for middle legs by attaching cable around foot plates.
8. ZIPPER DOOR AND OR END PANEL
8. zIPPeR DooR AND oR eND PANel INsTAllATIoN:
INSTALLATION:
A. Hold the end panel at the top center with the white inner
A. Hold the end panel at the top center with the white inner
surface facing the inside of the shelter (if you have a white
surface facing the inside of the shelter (if you have a white
shelter the inner surface has the visible weld seams).
shelter the inner surface has the visible weld seams).
B. Unscrew top rail from the top bend and place the webbing
in between. The top rail should pass through the loop of the
B. Unscrew top rail from the top bend and place the webbing
webbing. Reconnect top rail onto rib and secure it with the
in between. The top rail should pass through the loop of the
webbing. Reconnect top rail onto rib and secure it with the
screws indicated. See Detail I.
screws indicated. See Detail I.
C. Remove the nut from the side rail and carefully pull
the side rail away from the ShelterLock
(pull away only
C. Remove the nut from the side rail and carefully pull the side
enough to pass the webbing through the connection). If
rail away from the ShelterLock
(pull away only enough to
TM
this connection has the wind brace on it remove the
pass the webbing through the connection). If this connection
wind brace end before pulling the side rail. Replace the
has the wind brace on it remove the wind brace end before
cross rail and wind brace. see Detail j. Replace the nut and
pulling the side rail. Replace the cross rail and wind brace.
tighten. Repeat this on the other side.
See Detail J. Replace the nut and tighten. Repeat this on the
other side.
D. At the bottom, where the webbing exits the pocket on
each side of end panel, pull webbing to remove the slack.
D. At the bottom, where the webbing exits the pocket on each
Be careful not to pull the webbing through the other side of
side of end panel, pull webbing to remove the slack. Be careful
the panel.
not to pull the webbing through the other side of the panel.
e. Install the "S"- hook from the ratchet into the leg of the
shelter. Insert the webbing into the spindle of the ratchet
E. Install the "S"- hook from the ratchet into the leg of the shelter.
and pull tight. see Detail j. wind the ratchet so that the web-
Insert the webbing into the spindle of the ratchet and pull tight.
bing overlaps itself. Repeat this process on the other side of
See Detail J. Wind the ratchet so that the webbing overlaps
the panel. Position the end panel so that it is centered on the
itself. Repeat this process on the other side of the panel.
building.
Position the end panel so that it is centered on the building.
f. tighten the ratchets, alternating from one side to the other,
F. Tighten the ratchets, alternating from one side to the other,
until the end panel is tight. Repeat these steps on the other
until the end panel is tight. Repeat these steps on the other end
end of the building.
of the building.
05-201133_13-0D
DETAIL G
Detail G
01010
10114
MIDDLE
END LEGS
LEGS
DETAIL H
Detail H
Slits
slits
Slit in fabric
folded around
frame and cross
rails inserted
slit in fabric
through slits
folded around
frame and
cross rails
inserted
through slits
SIDE VIEW
INSIDE VIEW
Detail I
InsIDE VIEw
DETAIL I
DETAIL J
Detail J
Page 8

9. INsTAllINg THe CoVeR oN THe FRAMe:

A. Lay the cover on the ground next to the
frame with the inside of the cover (the side with
Secure with
the pipe pockets) facing down and the webbing
secure
Bolt and Nut
on the front and rear of the corner of the build-
with bolt
ing. Position the cover so that it is centered on
and nut
the frame, front to back. See Detail K.
b. fold over the side so the pipe pocket is now
accessible. Insert a cover pipe into the pipe
pocket slot, at the first middle rib from the front
and the first middle rib from the rear. some of
the pipe will be exposed. for long buildings it
may be necessary to use additional pipes in the
middle. See Detail L. Remove pocket pipe to
install later.
C. Tie the rope on each of the exposed pipes
and throw the other end of the rope over the
frame. See Detail M.
D. Move to the other side of the frame and pull
the cover over the frame with the rope. This
may require two or more people. See Detail N.
Check that the Logo reads upright as shown.
sIDE VIEw
DETAIL m
DETAIL K
DETAIL L
DETAIL n
Page 9
EnD PAnELs
nOT sHOwn
FOr cLArITY
05-201133_13-0D