Installation (continued)
3
Installing the supply
connections
NOTE: Be sure to position the body (D) correctly in the
wall, with the markings "UP" facing upward. The hot water
supply lines go into the H inlet, and the cold water supply
lines go into the C inlet. Do not use PEX or CPVC between
the valve and spout.
□
Wrap thread sealant tape around the pipe
threads in a clockwise direction, as shown.
□
Connect the hot and cold water supply lines (1,
not included), the shower outlet pipe (2, not
included), and tub outlet pipe (3, not included)
by threading them into the valve body (D) in a
clockwise direction.
□
Tighten the pipes to the valve body (D) with a
pipe wrench (not included).
□
Connect the pipe elbows (4, not included) to
the end of the shower outlet and tub outlet
pipes.
NOTE: If you do not wish to install the tub outlet, insert
the plug (H) into the bottom of the valve body (D).
D
1
D
1
4
2
3
4
2
H
4
Flushing the water outlets
and checking for leaks
□
Place the handle (F) on the valve body (D)
inverter and turn the handle (F) to the full on
mixed position. Turn on the hot and cold water
supply lines and allow the water to ow from
the outlets for one minute, or until all foreign
matter has been ushed out. Check for leaks.
□
Shut off the water at the faucet and supply
lines. Remove the handle (F).
F
6
D