Provide a copy of these Instructions to the end user of this product. These Instructions provide important
Dealer /
operating and safety information for proper usage of this product. Demonstrate the proper use of the
Installer:
product with the end user. Have the end user demonstrate that they understand the proper use of the
product.
Read and follow all instructions included in this manual. Ask your Dealer / Installer for assistance if you
End User:
do not understand the proper use of the product. Never remove any decals from the product.
CAUTION: Do not install base rails over plastic bed liners. Plastic bed liners must be cut out of the way. Rails may
be installed on spray in liners. Consult spray liner installer for recommended curing time.
Center Bolt Kit 32059 (sold separately) must be used when towing with a 26K hitch, Goose Neck, or
Maneuvering System.
WARNING! Never exceed the towing capacity of the tow vehicle.
Parts Include: Base Rails ( 2 )
Requires the use of a Husky Custom Bracket kit for a complete bed rail installation.
All Products limited to Vehicle Tow Rating, see Vehicle Owners Manual. Visit www.huskytow.com for Warranty Information /
Tech Support / Product Updates. ©2019 LKQ SPG. All Rights Reserved. 03/26/2019-Rev4
Assembly, Installation, Operation and
Maintenance Instructions
10 BOLT BASE RAIL KIT
See catalog listing for applications by vehicle.
Parts Include: Base Rails ( 2 )
1
P/N: 30686
Page-1