Putting The Converter Into Operation - R&S ZVA-Z75 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®
R&S
ZVA-Z75, -Z90, -Z110, -Z140, -Z170, -Z220, -Z325, -Z500
Risk of instrument damage
The RF input power at the connectors RF IN and LO IN must not exceed the maximum
values quoted in the data sheet. The maximum values are below the maximum RF
source power of the network analyzer. The frequency converter mode ensures compat-
ible source powers.
Before you connect your converter to the network analyzer, always activate the fre-
quency converter mode using the "Frequency Converter" tab of the "System Configura-
tion" dialog (see
on page 19) and select the proper converter type and connecting diagram.
2.3.5 RF Connectors – Output
Two SMA connectors:
MEAS OUT (measurement signal output)
REF OUT (reference signal output)
For correct cabling, please refer to
on page 12.

2.4 Putting the Converter into Operation

This section describes the basic steps to be taken when setting up the frequency con-
verter for the first time.
Risk of instrument damage
An unsuitable operating site or device condition can damage the converter. Before
switching it on, observe the information on appropriate operating conditions provided in
the data sheet. In particular, ensure the following:
Converter covers are in place and all fasteners are tightened.
Ventilation openings are unobstructed.
The converter is dry and shows no condensation.
2.4.1 Unpacking the Unit and Checking the Shipment
When your receive the converter, please take the following steps:
1. Unpack the converter and the other contents of the wooden shipping box.
Getting Started 1307.7039.62 ─ 11
Chapter 3.3, "Activating the Frequency Converter
Chapter 2.4.5, "Connecting RF
Preparing for Use
Putting the Converter into Operation
Mode",
Cables",
10

Publicidad

Tabla de contenido
loading

Productos relacionados para R&S ZVA-Z75

Tabla de contenido