Kohler K-2258 Guia De Instalacion página 3

Ocultar thumbs Ver también para K-2258:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FINISHED
K-2258-1
WALL
8-1/4
(21cm)
MOUNTING
HOLE
27 (68.6cm)
22-1/8 (56.2cm)
(S)
(T)
3/8 HOT
1-1/4 OUTLET
4
(10.2cm)
1. Preparation
(S) 10" (25.4cm) (Based on 12" (30.5cm) riser which may require
cutting).
(T) Pop-up drain is typically 14–1/2" (36.8cm); grid drain is
typically 13–5/8" (34.6cm).
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles will
not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a secure
material for the anchoring devices.
Apply two self-adhesive gaskets (provided) to each of the three
ridges in the bottom recess of the lavatory, as shown.
Mark the centerline on the floor.
Refer to the roughing-in information, and position the pedestal on
the floor centerline location at the required distance from the
finished wall.
Kohler Co.
2-3/8 (6cm)
8
(20.3cm)
22
(55.9cm)
1/2 (1.3cm) D.
MOUNTING HOLE
IN PEDESTAL
2-3/4 (7cm)
8-7/8
(22.5cm)
1/2 (1.3cm) D.
35
ANCHOR
(88.9cm)
HOLES IN
LAVATORY
3/8 COLD
3
K-2258-4
4 (10.2cm)
2-3/8
(6cm)
K-2258-8
4 (10.2cm)
2-3/8
(6cm)
3-1/4
(8.3cm)
1020736-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido