Kohler MasterShower K-75 Instrucciones De Instalación página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

C. SHEETFLOW ASSEMBLY AND END CAP:
Risk of damage to sheetflow and/or bottom
endcap. Do not support tower on sheetflow. Do not stand tower on
bottom end cap. Use styrofoam packaging as supports until unit is
hung on hinges.
1.
See Fig. #12 . Align endcap snug with bottom end of tower
door. Secure endcap to bottom of tower door with two
slotted-hex washer-head screws from hardware kit.
Risk of damage to endcap. Do not tighten hose
with only one wrench or you may damage end cap inlet joint.
2.
Remove cap from end of shower supply hose (inside tower
door). Using thread sealant, thread hose end to bottom end
cap assembly. Use two wrenches to tighten hose 1/2- to
3/4-turn past hand tight.
Sheetflow
Hose End
Tower
Door
Hand Shower
Supply Hose
3.
See Fig. #12 . Align sheetflow cap snug with top end of tower
door. Secure sheetflow cap to top of tower door with the two
slotted-hex washer-head screws from hardware kit.
4.
Remove the protective caps from the short connection hose
and the supply hose. Connect the hoses, and use two
wrenches to tighten 1/2 to 3/4-turn past hand tight.
Risk of damage to sheetflow. Do not tighten
hose with only one wrench or you may damage sheetflow inlet joint.
A
1017708-2-
Sheetflow Cap
Sheetflow
Connection
Hose
Cap Screw
Bottom End
Cap
Cap Screw
Fig. #12
D. TOWER ASSEMBLY:
1.
Identify the three #10-24 x 3/8" screws and washers provided.
Place washers over screws.
2.
Align hinge plates on tower door with brackets on wall
mounting box. Secure hinges with two screws in the upper
hinge and one screw in the lower hinge. See Fig. #13 .
Mounting
Screws
Tower
Door
3.
See Fig. #14 . Connect SJO transformer cord to connector
on TB1 circuit board connector.
Circuit Board
TB1 Connector
6
Wall
Mount Box
Mounting
Screws
Fig. #13
Strain Relief
SJO Cord from
Transformer
Fig. #14
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido