Handle
Escutcheon
Apply plumbers
putty.
Valve Body
2. Handle Valve Installation
NOTE: The valve body marked "Cold" (with blue lettered tape
attached to the tube) should be installed to the right of the faucet.
Apply a bead of plumbers putty or other sealant to the underside
of the escutcheons according to the manufacturer's instructions.
Insert the valve bodies into the proper mounting holes.
Install a washer and a nut onto the underside of each valve body.
Rotate each valve body until the copper tubing faces toward the
outside of the lavatory.
While holding the valve bodies in place, securely tighten the
locknuts with a wrench. Do not overtighten.
Remove any excess putty or sealant.
1002628-2-M
Washer
Nut
Copper
Tube
4
Kohler Co.