READ ALL INSTRUCTIONS CONTAINED HEREIN BEFORE PROCEEDING WITH INSTALLATION OF FIXTURE.
WARNINGS:
- HUBBELL LIGHTING WILL NOT WARRANTY ANY FIXTURES FOR ANY REASON IF THE INSTALLER OF THE
FIXTURE DOES NOT READ AND COMPLY WITH ALL OF THE INSTRUCTIONS CONTAINED HEREIN.
- DISCONNECT POWER BEFORE INSTALLATION OR SERVICING.
- INSTALL, OPERATE AND MAINTAIN TO MEET ALL APPLICABLE CODES.
- ALL SERVICING OR RELAMPING MUST BE PERFORMED BY QUALIFIED SERVICE PERSONNEL.
- ALL CONNECTIONS SHOULD BE CAPPED WITH SUITABLE INSULATED WIRE CONNECTORS (BY OTHERS).
- LAMP AND BALLAST MUST BE EQUAL ANSI CODE AND WATTAGE.
- THIS LUMINAIRE IS APPROVE ONLY FOR WALL MOUNT AND DOWNWARD ORIENTATION IN WET LOCATION.
STEP-I MOUNTING PREPARATION
* Using template (page 4) lay over junction box (A)
on the wall. Mark at (2) hole.
* Drill wall for the hardware appropriate for
the type of wall. Use 1/4" diameter bolts (not provided).
* Pull the supply wires (B) from junction box (A).
STEP-II FIXTURE MOUNTING PREPARATION
* To open door (C), loosen (2) retaining screws (D).
FLUOR., PS MH OR HPS:
* Loosen (4) screws (E) then gently lower reflector (F).
LED:
* CAUTION: Gently disconnect each LED ring (W)
and insert connector (Y) thru wireway hole (Z).
* Loosen (4) screws (K) then remove LED assembly.
STEP-III FIXTURE MOUNTING
* Insert all wires (B) thru opening
at the back of housing.
(Fig. 6)
* Hang fixture on the mounting hardware
at the wall thru key-slots opening (J).
* Tighten bolts securely.
* Apply caulking sealant around the
top and two sides of the housing.
STEP-IV WIRING
(Fig. 6)
POWER MUST BE OFF.
(WIRING MUST BE PERFORMED
BY A QUALIFIED ELECTRICIAN)
* Wire service leads to fixture power leads
according to local and National Elec. Codes.
* For direct wire connections, connect
ground wire to green wire then push
wire back to J-box on the wall. Connect
black to black and white to neutral then
push connections back inside J-box (A).
Hubbell Lighting, Inc.
A subsidiary of Hubbell Incorporated
701 Millennium Blvd • Greenville, SC 29607
Phone: (864) 678-1000
INSTALLATION INSTRUCTIONS
LAREDO LCC LUMINAIRE
(Fig. 1)
(Fig. 2)
(Fig. 5)
(Fig. 4)
FIG. 2
(Fig. 6)
W
(Fig. 5)
K
FIG. 4
ALIGN WITH TOP EDGE
OF JUNCTION BOX
B
FIG. 1
D
C
Z
Y
PAGE 1 OF 8
PAGE 1 DE 8
PAGINA 1 DE 8
MARK AT
CENTER
4" JUNCTION
BOX
2.750 REF.
5.500 REF.
N
H
FIG. 3
F
FIG. 5
E
Doc. Number:
Revision: *
A
SEE PAGE 4
FULL SIZE
TEMPLATE
G
CAULKING
93015006