Preparation; Assembly Or Installation Instructions - Allen + Roth 1650VA-36-285 Guia De Inicio Rapido

91,44-cm tocador con cubierta
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not
attempt to assemble the product.
Estimated Installation Time: 20 minutes (24 hours for silicone caulk to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors,
silicone caulk, power drill with drill bit
Helpful Tools (not included): Measuring tape, level
INSTALLATION INSTRUCTIONS
1. As shown in the diagram, fully extend the
drawer and locate the plastic levers on the
metal glide tracks. Push the left-side and
right-side levers at the same time to
disengage the drawer from the drawer glides.
Gently lift the drawer up to remove it from
vanity (A).
1
A
1
4
2

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

2694508

Tabla de contenido